Shown below: In shop full functional testing with customer to verify sequential operation of  a water remediation dozing panel system.   The completed system running multiple control panels ,  pumps contaminated ground water through this system, treating it and  at the end of the process returns it cleaned to the  aquifer that it was removed from.